1 item Report entitled 'Design Study for the inclusion of Boost Operated Switches into the Safety and Arming Unit for the Seaslug Mark 2 (H.E.) with I.R. Fuse'
1 item Report entitled 'An Investigation into S&A sub-unit performance under reduced acceleration conditions due to extended burning times of Retriever boost motors'
1 item Report entitled 'An Investigation into S & A Sub Unit performance under reduced acceleration conditions due to extended buring times of Retriever boost motors'
1 item Report entitled 'Test Procedure for Production Sample Testing of Safety & Arming Mechanism Sub Assemblies, for Seaslug Mark 2'
1 item Technical Publication entitled 'Formal Approval Design Test Procedure for Safety and Arming Mechanism, Safety and Arming Mechanism Sub Assemblies and Mechanical Sub Units, for Seaslug Mark 2'
1 item Report entitled 'Design Aim for the Safety and Arming Mechanism and Safety and Arming Mechanism Sub Assembly for Seaslug Mark 2'
1 item Report entitled 'A Report on the Effects of the Reduced Thrust from the Retriever Boost Motors After Storage and Possible Modifications to Accommodate the Effects'